nuestros
proyectos

A SUMMARY OF SOME OF OUR PROJECTS THAT HIGHLIGHT THE QUALITY OF OUR WORK TAKING INTO ACCOUNT ESSENTIAL ASPECTS

  • All
  • AUTOMOTIVE ENGINEERING AND DEVELOPMENT
  • CONTAINER FREIGHT FORWARDER
  • DESIGN, PROGRAMMING AND CONSTRUCTION OF INDUSTRIAL EQUIPMENT AND PROCESSES
  • ENGINEERING SERVICES FOR THE REFURBISHMENT AND HOMOLOGATION OF VEHICLES
  • MACHINE BUILDING
  • MANUFACTURE AND PROCESSING OF ARTICLES OF GRANITE AND NATURAL ROCK
  • MEAT INDUSTRY AND MULTI-PURPOSE WAREHOUSE
  • MODULAR BUILDINGS
  • REFRIGERATED WAREHOUSE
  • Sin categoría
  • STORAGE AND DISTRIBUTION OF BOOKS
  • STORAGE AND DISTRIBUTION OF CANNED FOOD
  • STORAGE AND DISTRIBUTION OF CLEANING PRODUCTS
  • WAREHOUSE OF NAUTICAL EQUIPMENT MATERIALS
  • CIMALAB (PORTAL SHIP)

    CimaLAB (PORTAL SHIP) Activity Automotive, engineering and development services Location PI Porto do Molle (Nigrán) Surface area 2.691,26 m2 Lead time  8 months

    Read more
  • FRIOTEA

    FRIOTEA (PROTEA) Activity Refrigerated Warehouse Activity PI As Gándaras (O Porriño) Surface area 11.269,02 m2 Lead time 18 months

    Read more
  • SYSPRO

    SYSPRO ActivityDesign, Programming and Construction of industrial equipment and processesLocationPI Porto do Molle (Nigrán)Surface area2.305,32 m2Lead time6 months

    Read more
  • DISTRIBUCIONES RIVAS

    Distribuciones Rivas ActivityWarehousing and Distribution of cleaning productsLocationPI Cataboi (O Porriño)Surface area4.453,75 m2Lead time7 months

    Read more
  • EDICIONES ARNOIA

    Ediciones ARNOIA ACTIVITY Book storage and distribution  LOCATION PI A Reigosa (Ponte Caldelas) SURFACE AREA 3.780 m2 LEAD TIME 12 months

    Read more
  • DISTEVI

    DISTEVI Activity Manufacture of machinery Location PI A Granxa (O Porriño) Superficie 2.323 m2 Lead time 6 months

    Read more
  • PAVESTONE

    Pavestone Activity Manufacture and production of granite and natural rock products. Location PI A Lagoa (Monçao) Surface area 2.034 m2 Lead time 6 months

    Read more
  • PEMOS

    PEMOS Activity 11 Modular warehouses  Location PI Veigadaña (Mos) Surface area 12.691 m2 Lead time 1 year + 9 months

    Read more
  • Red Ball Logistics (KALEIDO Ideas & Logistics)

    Red Ball Logistics (KALEIDO Ideas & Logistics) Activity Transitaria de Contenedores Location PI del Fulão (Cornes - Portugal) Surface area 6.860 m2 Lead time  12 months

    Read more
  • CONNORSA

    CONNORSA Activity Storage and Distribution of Tinned Food Cans Location Vilaboa Surface area 6.378 m2 Lead time 7 months

    Read more
  • V.R. Fábrica de Embutidos e Salazóns

    V.R. Fábrica de Embutidos e Salazóns Activity Meat Industry and Multi-purpose Warehouse Location PI Veigadaña (Mos) Surface area 1.038 m2 Lead time 7 months

    Read more
  • BAITRA

    Baitra Activity Nautical Equipment Materials Warehouse  Location PI Porto do Molle (Nigrán) Surface area 3.680,06 m2 Plazo de ejecución 10 months

    Read more
  • SYSPRO

    SYSPRO ActivityDesign, Programming and Construction of industrial equipment and processesLocationPI Porto do Molle (Nigrán)Surface area2.305,32 m2Lead time6 months

    Read more
  • DISTRIBUCIONES RIVAS

    Distribuciones Rivas ActivityWarehousing and Distribution of cleaning productsLocationPI Cataboi (O Porriño)Surface area4.453,75 m2Lead time7 months

    Read more
  • EDICIONES ARNOIA

    Ediciones ARNOIA ACTIVITY Book storage and distribution  LOCATION PI A Reigosa (Ponte Caldelas) SURFACE AREA 3.780 m2 LEAD TIME 12 months

    Read more
  • DISTEVI

    DISTEVI Activity Manufacture of machinery Location PI A Granxa (O Porriño) Superficie 2.323 m2 Lead time 6 months

    Read more
  • PAVESTONE

    Pavestone Activity Manufacture and production of granite and natural rock products. Location PI A Lagoa (Monçao) Surface area 2.034 m2 Lead time 6 months

    Read more
  • PEMOS

    PEMOS Activity 11 Modular warehouses  Location PI Veigadaña (Mos) Surface area 12.691 m2 Lead time 1 year + 9 months

    Read more
  • Red Ball Logistics (KALEIDO Ideas & Logistics)

    Red Ball Logistics (KALEIDO Ideas & Logistics) Activity Transitaria de Contenedores Location PI del Fulão (Cornes - Portugal) Surface area 6.860 m2 Lead time  12 months

    Read more
  • CONNORSA

    CONNORSA Activity Storage and Distribution of Tinned Food Cans Location Vilaboa Surface area 6.378 m2 Lead time 7 months

    Read more
  • BAITRA

    Baitra Activity Nautical Equipment Materials Warehouse  Location PI Porto do Molle (Nigrán) Surface area 3.680,06 m2 Plazo de ejecución 10 months

    Read more
  • V.R. Fábrica de Embutidos e Salazóns

    V.R. Fábrica de Embutidos e Salazóns Activity Meat Industry and Multi-purpose Warehouse Location PI Veigadaña (Mos) Surface area 1.038 m2 Lead time 7 months

    Read more
  • FRIOTEA

    FRIOTEA (PROTEA) Activity Refrigerated Warehouse Activity PI As Gándaras (O Porriño) Surface area 11.269,02 m2 Lead time 18 months

    Read more
  • CIMALAB (PORTAL SHIP)

    CimaLAB (PORTAL SHIP) Activity Automotive, engineering and development services Location PI Porto do Molle (Nigrán) Surface area 2.691,26 m2 Lead time  8 months

    Read more

more projects

SYSPRO
Actividad

Diseño, Progamación y Construcción de equipos y procesos industriales

Ubicación

PI Porto do Molle (Nigrán)

Superficie

2.305,32 m2

Plazo de ejecución

6 meses

FRIOTEA (PROTEA)
Actividad

Nave Frigorífica

Ubicación

PI As Gándaras (O Porriño)

Superficie

11.269,02 m2

Plazo de ejecución

18 meses

Automoción
Actividad

Edificio STC: Fabricación de otros componentes, piezas y accesorios para vehículos de motor.

Ubicación

Ctra. Zamáns, 20 – ZAMANS

Superficie

1.087,80 m2

Plazo de ejecución

10 meses

CimaLAB
(PORTAL SHIP)
Actividad

Servicios de ingeniería para la reforma y homolagación de vehículos

Ubicación

PI Porto do Molle (Nigrán)

Superficie

2.691,26 m2

Plazo de ejecución

8 meses

Distribuciones Rivas
Actividad

Almacenamiento y Distribución de productos de limpieza

Ubicación

PI Cataboi (O Porriño)

Superficie

4.453,75 m2

Plazo de ejecución

7 meses

Ediciones ARNOIA
ACTIVIDAD

Almacenamiento y Distribución de libros

UBICACIÓN

PI A Reigosa (Ponte Caldelas)

SUPERFICIE

3.780 m2

PLAZO DE EJECUCIÓN

12 meses

DISTEVI
Actividad

Fabricación de maquinaria

Ubicación

PI A Granxa (O Porriño)

Superficie

2.323 m2

Plazo de ejecución

6 meses

Pavestone
Actividad

Fabricación y Elaboración de artículos de Granito y Rocas Naturales

Ubicación

PI A Lagoa (Monçao)

Superficie

2.034 m2

Plazo de ejecución

6 meses

PEMOS
Actividad

11 Naves modulares

Ubicación

PI Veigadaña (Mos)

Superficie

12.691 m2

Plazo de ejecución

1 año + 9 meses

Red Ball Logistics (KALEIDO Ideas & Logistics)
Actividad

Transitaria de Contenedores

Ubicación

PI del Fulão (Cornes – Portugal)

Superficie

6.860 m2

Plazo de ejecución

12 meses

CONNORSA
Actividad

Almacenamiento y Distribución de Latas de Conservas

Ubicación

Vilaboa

Superficie

6.378 m2

Plazo de ejecución

7 meses

V.R. Fábrica de Embutidos e Salazóns
Actividad

Industria Cárnica y Almacén polivalente

Ubicación

PI Veigadaña (Mos)

Superficie

1.038 m2

Plazo de ejecución

7 meses

Baitra
Actividad

Almacén de materiales de Equipamiento Náutico

Ubicación

PI Porto do Molle (Nigrán)

Superficie

3.680,06 m2

Plazo de ejecución

10 meses